MyTRIZ Competition 2013
Team : SawaddeeTriz
Thai-Nichi Institute of Technology, Thailand
Part 1: Reduce Energy Usage รื ธ้ำ ็นีหำ
Potential Solutions
The outgoing water pipes from the tank are laid on the roof and go down inside the wall to absorb heat to reduce air-conditioning load before being connected to the tap water pipe at the ground floor.
The tap water pipe on the ground floor that come directly from outside will have low temperature.
Use temperature difference between hot water and cool water to generate electricity for lighting load.
|